Important Information:
The railway can be a dangerous environment. Laws that apply to working around railways often impose different and higher standards than those that apply to work being undertaken in other environments.

Entry to property controlled by V/Line is prohibited without a valid Site Access Permit (SAP). All access and approved activities must be in accordance with the terms and conditions as outlined in the Site Access Permit issued.

** The online form is best viewed by Internet Explorer 10.x or higher, and Google Chrome. If your browser is older, you may have trouble viewing many of our web site features properly. You can determine the version of your browser by choosing "Help" at the top of your browser window, then select "About" (your browser).

Existing Application

If you have an existing application, please enter the Application Number and User Name emailed to you and then click the Login button.


New Application

For New Application, please select the Application Type and click the Next button below.

Company to be invoiced

*
* *

*
* *
*
*

Contractor - Undertaking Access

*
* *

*
* *
*
*

Please Note:


It is V/Line's suggestion that an applicant refers to the checklist as a guide to completing this application (please refer to V/Line Site Access Guide, pages 7-10 and Appendix 4)

1. Location of Access

*
*
*
*

2. Purpose of Access

Please select one or more purpose of access from the list below (hold down the Ctrl key for multiple selections)

*

3. Impact Type

Please select the Impact Type below

Location Nature of Activity Impact Type Form of Safe-working Protection Required Required Rail Safeworking Qualifications for Track Force Protection Co-ordinator Required Rail Safeworking Qualifications for Other Persons in Danger Zone & Other Relevant Requirements
Outside Danger Zone – On Platform Station Building or in Carparks Any activity where there is a NO risk of entry into the danger zone 1 Nil Not required
  • Rail Safe-working not applicable
  • Traffic Management and Pedestrian Management may apply
Outside Danger Zone – Other than on Platform, Station Building or in Car Park Any activity where there is a minimal risk of entry by people plant or equipment into the Danger Zone 1 Level 1

Or

Nil - where Positive Delineation barriers have already been erected and approved by V/Line
Not required
  • All parties are to be Level 1, qualified



  • Not applicable
    If during the activity of erecting a Positive Delineation Barrier it is necessary to enter the danger zone then:
    a) where only hand tools are required to erect the barrier the works can be undertaken by Level 1 qualified person(s); however,
    b) where machinery is required to be used to assist in placement of the barrier a Level 3 qualified person must be in attendance with appropriate rail safeworking protection in place.
Within Danger Zone
  • Walking; and
  • no work being performed so that person/s is/are at all times able to maintain continual vigilance
1 Level 1

Level 3
Not required

(Level 3 - accompanying up to 3 unqualified visitor)
  • All parties are to be Level 1 qualified and responsible for their own safety
  • For every three unqualified person(s) within the Danger Zone there must be at least one person qualified in Safe-working Level 3 or above
Within Danger Zone Crossing of railway tracks at public crossing 1 Nil Nil
  • Obey road rules
Location Nature of Activity Impact Type Form of Safe-working Protection Required Required Rail Safeworking Qualifications for Track Force Protection Co-ordinator Required Rail Safeworking Qualifications for Other Persons in Danger Zone & Other Relevant Requirements
Within Danger Zone
  • Activity within the Danger Zone involving light battery operated or non-powered hand tools and equipment; and
  • There is good visibility, so that the Danger Zone can readily be cleared when a train approaches
2 Level 3 Level 3
  • All parties are to be Level 1 qualified with Level 3 also in attendance
Within Danger Zone
  • Activity within the Danger Zone involving light battery operated or non-powered hand tools and equipment; and
  • There is poor visibility, so that the Danger Zone cannot be readily cleared when a train approaches
2A Full Track Protection Level 3
  • All parties are to be Level 1 qualified with Level 3 directing full track protection
Within Danger Zone
  • Activity where the use of machinery is outside 3 metres zone
2B Level 1 & Level 3 Level 3
  • All parties are to be Level 1 qualified and be under the supervision of a level 3 TFPC
Location Nature of Activity Impact Type Form of Safe-working Protection Required Required Rail Safeworking Qualifications for Track Force Protection Co-ordinator Required Rail Safeworking Qualifications for Other Persons in Danger Zone & Other Relevant Requirements
Outside Danger Zone
  • Work where there is a potential risk of entry into the Danger Zone, particularly by machinery
3 Full Track Protection Level 3
  • All parties on site are to be Level 1 with Level 3 also in attendance
  • A certificate of train running or signalling may be required, as determined by V/Line
  • Does involve heavy machinery and/or there is considered by V/Line or by the Track Force Protection Co-ordinator to be a risk of inadvertent encroachment into the Danger Zone
3 Positive Delineation barriers are required Level 3
  • Delineation barrier erection as per Impact type 1
  • Work method standards to address passage of Trains
  • A certificate of train running or signalling may be required, as determined by V/Line
  • Certificate of train running or signalling may be required
Location Nature of Activity Impact Type Form of Safe-working Protection Required Required Rail Safeworking Qualifications for Track Force Protection Co-ordinator Required Rail Safeworking Qualifications for Other Persons in Danger Zone & Other Relevant Requirements
Within Danger Zone
  • Work involving powered tools or machinery, or presenting an obstruction to rail traffic
  • Can be carried out between trains and is not expected to disrupt train operations
4 Full Track Protection Level 3
  • All parties are to be Level 1
  • A certificate of train running or signalling may be required, as determined by V/Line
  • Level 3 in attendance at all times
Location Nature of Activity Impact Type Form of Safe-working Protection Required Required Rail Safeworking Qualifications for Track Force Protection Co-ordinator Required Rail Safeworking Qualifications for Other Persons in Danger Zone & Other Relevant Requirements
Within Danger Zone
  • Work presenting an obstruction to rail traffic, where rail traffic is to be rescheduled and or re-routed around the worksite
5 Absolute Occupation Level 3
  • All parties are to be Level 1, qualified and looking after themselves, unless otherwise approved by V/Line
  • A certificate of train running or signalling may be required, as determined by V/Line
  • Work Notification Form required
  • Notifications of works are to be provided a minimum of 7 days prior to allow for appropriate Safeworking documentation to be issued

4. Period of Access Required

Proposed End Date *
Please be mindful that V/Line requires a minimum of 28 business days to review and process newly lodged applications. Confirmation should be sought from V/Line prior to booking Crew and Equipment for the proposed dates of access.

5. Description of your works

Be specific - We will not accept generic information for the works.
*

6. Temporary Maintenance Plan

Where there is a need for temporary maintenance of V/Line controlled Property while the access is being undertaken - provide details of any proposed temporary maintenance to be carried out.

*

7. Rail Safety

A Works Notification Form will be sent to your registered email address to be completed upon submission of this application

Please detail what safe working will be applied as part of your works?

*

8. Rail Site Safe-working Plan and Implementation

Detail the Rail Safe-working Plan requirements and how these will be implemented

*

9. Safe-working Qualifications

Please provide copies of ALL work personnel rail accredited tickets or, please provide a copy of your procedure which details how this requirement is managed and ensures that accreditation is kept current within your workforce. For further clarity of rail safe-working requirements please refer to ‘Appendix 1 – Summary of Activities, Impact Types and Safe-working Qualifications’ within V/Line Site Access Guide

*

10. Rail Design Documentation

Please provide all relevant Rail Design documentation which is applicable to your works and purpose of access.

*

11. Underground Obstacles Report

If the works involves breaking the ground, a cable search report and underground services report must be submitted. NB. V/Line does NOT subscribe to Dial Before You Dig, Independent underground obstacle searches must be performed by the contractor. A VicTrack comms cable search is required as well as a search for other authority’s services. Service proving is mandatory. Please do not check if this is not applicable to your works.

Please describe what investigations of underground obstacles have been carried out/need to be carried out as result of your works

*

12. Disruption to V/Line Infrastructure & Operations (must be completed by all Applicants)

Please describe what disruptions to V/Line Infrastructure and Operations that may occur as a result of your works?

*

13. Traffic Management Plan (TMP)

14. Resources

Please list any resources that you may require from V/Line (i.e. Signaller, Signal Maintenance Technician, Rolling Stock etc…)



15. Approvals from other authorities or rail operators

Please confirm if the area to be accessed requires other land owner/ asset operators approvals? Also please advise of the status for obtaining all other applicable approvals (including any reference numbers). Please note that it is solely the responsibility of the access requester to obtain any applicable approvals relevant to the proposed area to be accessed and for which the adjoining land/or rail tracks may be controlled by other rail/infrastructure operators and/or other applicable land owners.

*

16. Insurance

Please provide details of your Certificate of Currency of Insurance:

  • Public Liability Insurance - Minimum $20 Million
  • Professional Indemnity Insurance
*

Please note that if you are undertaking any maintenance or construction works V/line reserves the right to request additional insurance requirements.

17. Environmental Management Checklist

Will the works potentially have impact on the following? Please do not check the box if the option does not apply to your works.


In addition, do the works involve:

18. Quality Assurance

Please provide details as to any Quality Assurance documents that will be developed as part of your works. Please refer to ‘Appendix 4 – Section 7’ within V/Line Site Access Guide

19. Communication Plan

Please provide details of any communication plans which are applicable to your works. Please refer to ‘Appendix 4 – Section 8’ within V/Line Site Access Guide


Application Declaration

Please note that formal declaration must be made before submission of this application.

Terms and Conditions:
Additional information may be required after we have reviewed your application including:
  • Additions or modifications to the Site Safe-working Plan if requested by V/Line must be supplied;
  • For major, complex or extended works, V/Line may require the preparation of additional documentation and additional fees may result.
  • For the inclusion of any new rail equipment or items, an approved type approval is required before installation
  • Following consideration of the nature of the application it may be determined that the assessment of the application is of such a nature that our out of pocket expenses in assessing and approving your application may exceed the standard application fees. In this instance additional payment may be required prior to issuing of the Site Access Permit.
Upon receiving a formal request for access to V/Line controlled land, V/Line requires a minimum of 28 days notice to review and process your application prior to the proposed date of access. V/Line reserves the right to postpone issuing a Site Access Permit in the case that insufficient information/relevant documentation has NOT been provided during the review period. We remind you that access to V/Line property cannot be undertaken without the issue of a Site Access Permit. For further information, please refer to the V/Line Site Access Guide.

V/Line is committed to protecting the privacy of personal information. For further information regarding V/Line’s Privacy Policy please refer to www.vline.com.au/home/website/privacypolicy